Reasons why you should hire concrete floor installers.
Plumbing in concrete floors.
The plumbing trenches are typically dug at the same time as the slab footings if any.
It can also run under sidewalks stoops patios and decks.
647 784 8448 or email.
Once you have finished scoring all the concrete that lies in the path where the plumbing will be installed it s time to get the concrete out.
There are two primary methods used for removing a scored concrete floor a jackhammer and or a sledgehammer.
At this point you will no longer see the horizontal drainpipes and the main sewer line but you will see the stubs that extend vertically out of the sand.
Before the concrete trucks come the contractor fills in the area over the network of plumbing pipes and drain lines with compacted sand.
Also notice the drain is centered right in the middle of this 30 inch vanity.
Once the concrete is out you can dig in the remaining trench to remove the sand or soil before running the new plumbing.
The center of the lav s drain is located 18 approximately above the finished floor.
Plumbing is one of the rough in elements of construction and is generally hidden by the finished elements such as walls floors and roofs.
Removing concrete for plumbing.
To book free estimate call.
The top openings should be packed with something to prevent concrete or debris from falling into the line.
Considerations cutting through a concrete floor should be a last resort.
The bathroom sink s water lines are roughed in 3 inches above the drain.
When a house is to have a poured concrete slab first floor all the pipes and fittings below the floor level must be put in place before the floor is poured.
Once the trenches are dug you can add the sewer pipes and stub outs pipes that sit above the slab floor that eventually connect the sink toilet bathtub or shower and any other drains to the system.